가설건축물 신고대상Temporary buildings are stipulated in the Building Act, and the enforcement ordinance stipulates the purpose of installation, structure, use, and retention period.
It is setting the purpose and scale for temporary and temporary use.
If these temporary buildings are also used as temporary buildings for other purposes by changing their use, or if they are in accordance with laws or ordinances,
It could also be used by converting it into a regular official building.
Temporary buildings built for temporary purposes, such as construction, may be built only by reporting without obtaining permission.
In addition, a person who intends to build temporary buildings for purposes prescribed by Presidential Decree, such as disaster recovery, entertainment, and exhibitions,
Retention period prescribed by Presidential Decree: 2 years, to the Governor of a Special Self-Governing Province or the head of a Si/Gun/Gu in accordance with the standards and procedures for establishment
Construction must commence after reporting.
Unlike those subject to permission, standards such as building-to-land ratio, floor area ratio, height, and mandatory landscaping facilities are not applied to temporary buildings subject to reporting.
Specific types include model houses, buildings for disaster recovery, containers for temporary offices, prefabricated guard posts of 10㎡ or less,
There are prefabricated garages with a height of 8 meters or less, and there are differences according to local government ordinances.
Building ledger, building coverage ratio, floor area ratio, land division restriction, building height restriction, building height restriction for securing the right to sunlight, National Land Planning and Utilization Act Article 76 Restrictions on construction within use zones and use districts.
Construction supervision of buildings, measures for land excavation, etc., landscaping within the site, system of the site and roads
Designation of building lines, building restrictions by building lines, structural strength, etc., evacuation facilities of buildings, restrictions on use, etc.
Fireproof structure and firewall of buildings, buildings in fire prevention districts, internal finishing materials of buildings, basement floors
Measures in case the site of the building spans the local district, disaster risk area, building equipment standards, etc.
Elevators, building energy use and waste material utilization, technical standards
For temporary buildings that can only be reported, the date of use must be determined and reported 5 days prior to the start of construction.
A temporary building construction report and a location map of the temporary building shall be drawn and submitted on the layout map of the relevant lot.
Along with this, submit the relevant lot number land ledger, land use plan confirmation, and certified copy of land registration.
The retention period for a report is two years and can be extended, and there is no limit on the minimum retention period.
Permission must be obtained when building in urban planning facilities or planned facilities.
In cases where property rights cannot be exercised for a long period of time due to being tied to urban planning facilities, the
The license period is 3 years. However, it can be extended until the urban planning project is implemented.
There are no area restrictions.
The relevant temporary building shall not have a reinforced concrete/steel frame reinforced concrete structure and shall be three stories or less.
It should be allowed in the local district for its use and should not require the installation of new trunk line supply facilities after construction.
In addition, it must not be a building that is built for the purpose of selling apartment sales facilities, transportation facilities, etc.
Permission must be obtained from the head of the Si/Gun/Gu according to the local construction ordinance.